For reasons lost to the dustbin of history we decided to replace the (admittedly not great) Swedish flat-pack shelves in a big closet with bespoke adjustable shelves. At least the shelves themselves would be bespoke, I suppose the rest of it (i.e. the shelf standards, the brackets, etc.) would be manufactured by others. Like any good project, it was subject to constant feature creep: if we’re going to pull out the old shelves then we might as well take the opportunity to paint. If we’re going to paint then we should take the trouble to move the water heater and do the job properly. As long as we’re doing the job properly we should pull the molding, ad infinitum, ad nauseum.
Tabula rasa

After pulling out the Swedish shelves this was what we were left with. In the corner is the water heater for the shop, concealing (poorly) that the last time the room was painted they neither bothered to move the water heater nor to paint behind it. Continuing in the spirit of making the project expand to take all available time, we disconnected the water heater and drained it, enabling us to get it out of the way and (eventually) paint properly.

New molding
Having the water heater out of the way opened the floodgates, at least metaphorically. As long as we had gone that far we might as well pull the molding, which ranged in condition from “fair” to “you must be kidding.” Having seen just how poor shape the molding is in, the obvious thing to do is replace it all. Sigh.

Patching the mystery
Down below knee height there was a mystery panel, implemented with a scrap of paneling screwed to the drywall.



Removing the mystery panel revealed (drumroll please) … nothing! The opposite side of that wall is the 1/4 bath for the office, and as best as I could see the only thing vaguely aligned with that hole is the drain line for the sink in the powder room, but that’s new work, while the patch appears to be old. Maybe it’s coincidence? In any case, in for a penny, in for a pound, so we decided to patch the hole properly. In deference to my hatred of the popcorn texturing that was used throughout the office (formerly a caretaker apartment) I didn’t apply any to any of the patch work. I’d rather have the mixed appearance of some proper flat walls and some popcorned walls than voluntarily inflict more of that rubbish on myself.
Paint!

Time for paint, a task that was left to me to perform solo. I applied a fair bit of spackle to clean up the extensive wall damage, as well as some Killz to some areas that looked like they’d been wet at some point in the past. From there it was a good heavy coat of latex in a generic shade (swiss coffee) that was leftover from painting the office. Once it was done someone remarked to the effect that having gone to all that work we probably should have painted the ceiling as well. While sympathetic to the idea, I was happy to skip that particular treat.
Shelves

Finally it was time to install the shelves! The top-most shelf is 14 inches deep, and they get one inch deeper per shelf, with an 18 inch deep bottom shelf. The idea was to provide some deeper storage and some shallower storage. Was it worth it? Eh, if I had it to do over again I probably wouldn’t have bothered.



Each shelf is just shy of 13 feet long (154 inches) and includes a joint due to a dearth of 13 foot long pieces of plywood. We experimented with doing a simple butt joint held together with pocket screws, but talked ourselves out of it, with the assumption it wouldn’t be strong enough. Instead we ended up fabricating plates to hold the joint together with 1/4″ flat head bolts and threaded inserts.
Mistakes were made
Next to the water heater there’s an outlet about halfway up the wall. The box didn’t appear to be particularly well attached to anything, so I figured I should replace it. Actually, that’s a lie. The outlet was cream colored, which I find particularly ugly, and swapping it out for a white outlet would be a simple project, so why not?



Why not is because the existing box turned out not to be particularly well attached to anything. It was actually an “old work” box, to my surprise — I can’t see why somebody would have chosen to add an outlet there after the fact, right on top of the water heater. Needless to say, the hole was oversized to begin with, and my manhandling to replace the outlet in the existing box mostly just succeeded in destroying the edges of the hole, creating a new problem to fix. So for my trouble we ended up relocating the box to the nearest stud and patching the drywall patch to conceal the damage I caused. Thanks to good planning this was done after painting, returning the water heater to its home, and installing the shelves.
All done!

We got there in the end, albeit we turned a one day project into a month of weekends.